Repository logo
 

Fresno Irrigation District's three-year maintenance and facility upgrade plan

dc.contributor.authorStretch, Bill, author
dc.contributor.authorMowry, David, author
dc.contributor.authorU.S. Committee on Irrigation and Drainage, publisher
dc.date.accessioned2020-07-30T12:42:09Z
dc.date.available2020-07-30T12:42:09Z
dc.date.issued2010-03
dc.descriptionPresented at Upgrading technology and infrastructure in a finance-challenged economy: a USCID water management conference held on March 23-26, 2010 in Sacramento, California.
dc.description.abstractThe Fresno Irrigation District (District) is in its third and final year of an ambitious Three-Year Maintenance and Facility Upgrade Plan (Three-Year MFUP). The improvement costs are estimated at $18.5 million, with $10.3 million coming from bonds and $8.2 million coming from outside contributions. These outside contributions include federal and state grants and in-kind District labor. In order to minimize immediate fiscal impacts to landowners, the District decided to bond the initial capital funds and to repay them over time. The Three-Year MFUP is structured in such a way that it "catches-up" on major infrastructure deficiencies and needs within the District, focusing on deferred maintenance projects and capital improvements. The capital improvements included retrofitting existing weir structures with long crested weirs and automated gates; SCADA and telemetry improvements; improved measurement at lateral headings and selected grower turnouts; regulation and recharge basins; replacement of leaking pipelines; lining problematic portions of open canals; automated trash racks; and improving rights-of-way along open canals. The projects are being constructed by contractors as well as the District's construction forces. Due to the specialized nature of the majority of the capital improvements the District has been able to minimize costs and construct a greater number of projects by utilizing its construction forces.
dc.format.mediumborn digital
dc.format.mediumproceedings (reports)
dc.identifier.urihttps://hdl.handle.net/10217/210937
dc.languageEnglish
dc.language.isoeng
dc.publisherColorado State University. Libraries
dc.relation.ispartofAg Water Conservation Policy
dc.relation.ispartofUpgrading technology and infrastructure in a finance-challenged economy, Sacramento, California, March 23-26, 2010
dc.rightsCopyright and other restrictions may apply. User is responsible for compliance with all applicable laws. For information about copyright law, please see https://libguides.colostate.edu/copyright.
dc.sourceContained in: Upgrading technology and infrastructure in a finance-challenged economy, Sacramento, California, March 23-26, 2010, http://hdl.handle.net/10217/79280
dc.titleFresno Irrigation District's three-year maintenance and facility upgrade plan
dc.title.alternativeUSCID water management conference
dc.typeText

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
115_2010_CA_USCID_Stretch.pdf
Size:
1.31 MB
Format:
Adobe Portable Document Format