Simons, D. B., authorLi, R. M., authorBrown, G. O., authorCivil Engineering Department, Engineering Research Center, Colorado State University, publisher2017-05-262017-05-261979-08http://hdl.handle.net/10217/180889CER79-80DBS-RML-GOB9.Prepared for U.S. Army Corps of Engineers, Vicksburg District, Vicksburg, Mississippi.August 1979.Includes bibliographical reference.The primary purpose of the Phase I study was to evaluate the overall river basin response in both the main stem and its major tributaries associated with the Upper Yazoo Project. In accordance with the letter dated March 30, 1978, from the U.S. Army Corps of Engineers, Colorado State University was requested to conduct an additional study on the Greenwood Bendway. The purpose of this additional study is to study flood control and sedimentation problems associated with the Greenwood Bendway in the Yazoo River Basin, Mississippi.born digitalreportsengCopyright and other restrictions may apply. User is responsible for compliance with all applicable laws. For information about copyright law, please see https://libguides.colostate.edu/copyright.Sedimentation and deposition -- Mississippi -- Yazoo RiverSedimentation study of the Yazoo River Basin. Greenwood Bendway StudyText