Davar, Aleji, authorBarari, Ahmad, authorU.S. Committee on Irrigation and Drainage, publisher2020-05-152020-05-152001-06https://hdl.handle.net/10217/206858Presented at the 2001 USCID water management conference, Transbasin water transfers on June 27-30, 2001 in Denver, Colorado.The purpose of this paper is to discuss problems associated with performance of earth canals, designed for non-scouring and non-silting flow, and suggest operational procedures to minimize the sedimentation problem for transbasin projects, where adequate facilities for removal of suspended solids may not be available at the headworks. Remarks are based on observations of site characteristics, and analysis of field data for the Moghan Irrigation Project, as a part of the Mill and Moghan Project constructed jointly between Iran and the Republic of Azerbaijan (a former Soviet Union republic).born digitalproceedings (reports)engCopyright and other restrictions may apply. User is responsible for compliance with all applicable laws. For information about copyright law, please see https://libguides.colostate.edu/copyright.Effect of operation procedures in sediment transport in a transbasin canal sysytem [sic]Transbasin water transfersEffect of operation procedures in sediment transport in a transbasin canal systemText