Burt, Charles M., authorGilton, Michael B., authorJohansen, Kevin, authorCrowe, Keith, authorU.S. Committee on Irrigation and Drainage, publisher2020-05-192020-05-192002-07https://hdl.handle.net/10217/206934Presented at the 2002 USCID/EWRI conference, Energy, climate, environment and water - issues and opportunities for irrigation and drainage on July 9-12 in San Luis Obispo, California.South San Joaquin Irrigation District (SSJID) in Manteca, California, is beginning an ambitious modernization program to increase its water delivery flexibility. The district has over 200 miles of 30-60 inch cast-in-place (CIP) concrete pipeline that currently allow for little flexibility. SSJID will install four reinforced concrete interceptor pipelines and regulating reservoirs to redistribute water among the CIP pipelines and provide improved flexibility. The district's goal is to improve efficiency and encourage farmers with pressurized irrigation systems to shift from well water to surface water.born digitalproceedings (reports)engCopyright and other restrictions may apply. User is responsible for compliance with all applicable laws. For information about copyright law, please see https://libguides.colostate.edu/copyright.Breaking the technology barriers imposed by cast-in-place concrete pipe in irrigation districts - case study of South San Joaquin Irrigation DistrictUSCID/EWRI conferenceCast-in-place concrete pipeText