Cost of using building information modeling (BIM) in retrofit projects

Date

2017

Authors

Odhyan, Gaurav Singh, author
Olbina, Svetlana, advisor
Nobe, Mary, committee member
Skiba, Hilla, committee member

Journal Title

Journal ISSN

Volume Title

Abstract

Building information modeling (BIM) is a process that involves the creation and use of an n-dimensional model that can be used in the design, construction, and operation of a building. BIM is changing the process by which buildings are designed, constructed, and used by future generations. However, many owners require seeing quantitative measurements when discussing the benefits of BIM, and these benefits are difficult to quantify into a cost. Previous research has shown the benefits of BIM in new construction, but there is no sufficient research on the benefits of BIM in retrofit projects. BIM can assist in understanding existing buildings and executing the retrofit work. The research goal is to show owners and contractors the cost of using BIM in retrofit projects by comparing the cost benefits of implementing BIM with the fees required. This research provides a methodology to calculate and quantify the cost of using BIM on retrofit projects and evaluate whether BIM is a worthwhile investment for owners. There are three objectives of this research: 1. Identify the factors used in calculating the cost benefits of using BIM in retrofit projects. 2. Develop a systematic approach to cost analysis to quantify the cost benefits of using BIM in retrofit projects. 3. Perform a cost analysis to investigate whether there are economic benefits of using BIM compared to not using BIM for retrofit projects. A comprehensive literature review is conducted to understand the benefits of implementing BIM in construction projects. After determining the factors that could be used to quantify the benefits of using BIM in retrofit projects, a methodology is developed for the quantification of these benefits into a cost. The developed methodology is applied to a real-life retrofit project. The potential cost benefits of implementing BIM in this project are calculated based on measurable cost benefits associated with reduced change orders and reduced schedule overruns. A cost analysis has been performed using the cost benefits and the fees required for implementing BIM in a retrofit project. The research shows that the use of BIM has prevented five change orders in the real-life project. The change orders would have resulted in rework costs as well as schedule overruns. The cost of rework and penalties due to schedule overruns caused by the change orders are calculated. The cost analysis shows that in some scenarios the fee required to implement BIM is higher than the cost benefits of using BIM, and in some scenarios the fee required to implement BIM is lower than the cost benefits. In one of the scenarios, BIM has resulted in a loss of 59% of the fees required to implement BIM in the retrofit project, and in another scenario, BIM has resulted in a gain of 17%. This research attempts to analyze the cost related to the use of BIM in a retrofit project. The research results provide the owners and the general contractors with an estimate of the cost related to BIM use in the project.

Description

Rights Access

Subject

change orders
schedule overrun
return on investment
BIM